The Project

Objectives

  • Visual Inspection and Testing on mechanical assets (e.g. pump, piping, valves) and electrical assets (e.g. GENSETs, transformers, MCC, Motors) using developed set condition states and standards;
  • Energy Audit;
  • FDAS and WEM studies;
  • Determination of optimal 5 years intervention program;
  • Life cycle cost analysis and estimation of Return on Investment.

Responsibilities

  • Record inspection and testing data in a centralized relational database system (MySQL);
  • Big data analysis and data solutions on 5-10 years operation data to detect trend and reliability of the system;
  • Investigation of current design and operational scheme using qualitative reliability analysis (e.g. FMEA);
  • Weibull Analysis and Faul Tree Analysis to estimate reliability;
  • Development of a Life Cycle Cost model using reliability concept to determine optimal intervention strategies and program;
  • Organizing a series of training and technical workshops on reliability study and modelling used in the project.

Lesson Learned

Authorship

  • Nam led the team and trained the team to use LaTEX system to compile all reports

Back to Projects

Avatar
Nam Le
Risk and Asset Management Specialist for Buildings and Engineering Systems

My research interests include Operation Research and Applied Statistics for Asset Management of Buildings and Engineering Systems.

Next
Previous