Lamesa 2 - Maynilad

  • Client: Maynilad Water Services Inc.
  • Name: Rehabilitation, Retrofitting and Process Improvement of Lamesa 2 Water Treatment Plant
  • Theme: Asset Management, Process Improvement, Retrofitting, Rehabilitation
  • Scale: 900 MLD
  • Timeline: Engineering (Jun/2016-Dec/2016), Procurement and Bidding (Aug/2016-Sep/2017), Construction (Oct/2017 onward)

Objectives

  • Upgrade the existing Pulsator WTP (900MLD) to cope with
    • High turbidity events in raining seasons (e.g. NTU up to 2000);
    • Slow performance of Sludge Extraction System under high turbidity events;
    • Rapidlly deterioration and corrosion of structures and assets;
    • 7.2 magnitute of earthquake.
  • Provide better integration and connectivity with the Lamesa 1 Water Treatment Plant (1200 MLD) and the Sludge Treatment Facility (STF) being designed and constructed by JFE Contractor.
  • Provide fully Automation and integration (e.g. SCADA)

Roles and Responsibilities

  • Project Management

Lesson Learned

Authorship

Back to Projects

Avatar
Nam Le
Risk and Asset Management Specialist for Buildings and Engineering Systems

My research interests include Operation Research and Applied Statistics for Asset Management of Buildings and Engineering Systems.

Next
Previous