Plant Audit - Maynilad

The Project

Objectives

  • Visual Inspection and Testing on mechanical assets (e.g. pump, piping, valves) and electrical assets (e.g. GENSETs, transformers, MCC, Motors) using developed set condition states and standards;
  • Energy Audit;
  • FDAS and WEM studies;
  • Determination of optimal 5 years intervention program;
  • Life cycle cost analysis and estimation of Return on Investment.

Responsibilities

  • Record inspection and testing data in a centralized relational database system (MySQL);
  • Big data analysis and data solutions on 5-10 years operation data to detect trend and reliability of the system;
  • Investigation of current design and operational scheme using qualitative reliability analysis (e.g. FMEA);
  • Weibull Analysis and Faul Tree Analysis to estimate reliability;
  • Development of a Life Cycle Cost model using reliability concept to determine optimal intervention strategies and program;
  • Organizing a series of training and technical workshops on reliability study and modelling used in the project.

Lesson Learned

Authorship

  • Nam led the team and trained the team to use LaTEX system to compile all reports

Back to Projects

Avatar
Lê Thanh Nam
Kĩ sư đánh giá rủi do, quản lý dự án xây dựng, quản lý các hệ thống kĩ thuật nhà máy và công trình

Nghiên cứu và ứng dụng vận trù học, toán tối ưu, xác xuất thống kế trong việc quản lý và vận hành các hệ thống tài sản kĩ thuật và công trình.

Sau
Trước